After several weeks of 12 hour days at Pont de la Taule, on Friday at midnight I finally managed to finish all the plumbing (except for a washing machine waste). WC, shower, basin, kitchen sink, hot and cold water all working. There's still about 10 days work to do but now I can do at a more sensible pace.

This weekend I have been able to start catching up with works at Quélébu. Scything the fields, moving all the tractor machinery, some pointing to try and block up a wasp's nest in the front wall, digging over the vegetable patch and transporting 4 trailer loads of manure from the barn, burning 3 more huge piles of branches from the May snows, weeding the patio and cleaning the house.

On Saturday evening Mellie and Suzie dropped in on their grand tour of Europe.

Après plusieurs semaines de 12 heures par jour à Pont de la Taule, le vendredi à minuit, j'ai finalement réussi à terminer toute la plomberie (sauf l'evacuation de machine à laver). WC, douche, lavabo, évier de cuisine, eau chaude et froide - tous marches. Il y a encore environ 10 jours de travail à faire mais maintenant je peux faire à un rythme plus raisonnable.

Ce week-end, j'ai pu commencer à rattraper travaille à Quélébu. Faucher les champs, transporter toutes les utiles de tracteur, faire les joints afin d'essayer de bloquer un nid de guêpes dans la mur avant, becher le potager et transporter 4 remorques de fumier de la grange, brulée 3 molles de branches de la neige de mai, et la désherbage et le nettoyage de le patio de la maison.

Le samedi soir, Mellie et Suzie ont visité dans leur grande tournée de l'Europe.