samedi 3 avril 2021
Porch progress
The worst wasn't over! The stone wall of the single storey bathroom had been built with steel reinforced concrete intermixed with granite blocks, took a day and half to dismantle it! Door now relocated, old door blocked up and today floor insulated and screeded ready for tiling. Window next though.
Inscription à :
Publier les commentaires
(
Atom
)
Aucun commentaire :
Enregistrer un commentaire