samedi 28 mai 2022
vendredi 27 mai 2022
living room progress
Rubble levelled and blinded, insulation down
DPM and second day of concreting
Concreting over ready for moving central heating circuits and reconnecting radiators
Roughing out the new fireplace and stove location
vendredi 13 mai 2022
samedi 7 mai 2022
Living room floor
The living room has been slowly rotting since before I bought the house at Quélébu. I've been putting the project for for a long time but at last it can wait no more. The old floor boards are removed and cut for firewood, the sleeper walls have knocked over and broken....next job is trying to turn it into smaller hardcore to form a sub-base for the new concrete floor and ceramic tiles.