samedi 28 mai 2022


 Fireplace under construction

vendredi 27 mai 2022

sheep shearing

 











living room progress

Rubble levelled and blinded, insulation down

DPM and second day of concreting

Concreting over ready for moving central heating circuits and reconnecting radiators

Roughing out the new fireplace and stove location
 

samedi 7 mai 2022

Living room floor


The living room has been slowly rotting since before I bought the house at Quélébu. I've been putting the project for for a long time but at last it can wait no more. The old floor boards are removed and cut for firewood, the sleeper walls have knocked over and broken....next job is trying to turn it into smaller hardcore to form a sub-base for the new concrete floor and ceramic tiles.