The living room has been slowly rotting since before I bought the house at Quélébu. I've been putting the project for for a long time but at last it can wait no more. The old floor boards are removed and cut for firewood, the sleeper walls have knocked over and broken....next job is trying to turn it into smaller hardcore to form a sub-base for the new concrete floor and ceramic tiles.
samedi 7 mai 2022
Inscription à :
Publier les commentaires
(
Atom
)
Aucun commentaire :
Enregistrer un commentaire