A busy week with an excavator (mini-pelle) connecting the barn to the septic tank and water supply and also installing electric and internet cables for the new solar panels will need to be connected to the meter in the house.
All tidy...it looked like the Somme yesterday with somme of the trenches 1.20m deep. Still have an inspection chamber cover to install where the vertical pipe is.
New water connection and stop valve
resculpted banks - less steep easier to strim
Pulling these cables was a sod - I hadn t counted on there being three screened data cables as well in the duct
Whilst I had the excavator, I also dug out the ground on the otherside of the new door and started resculpting the bank above the new retaining wall.