More digging and tree felling today. The space for the rear terrace is excavated and beside the barn too, where Alain wants build a covered parking area/wood store. Another day or so to finish removing all the soil/rocks etc. Once the digger has gone I can start building the stone retaining wall and reconnecting the storm water pipes.
Finally the void behind the wall I constructed from all the stones removed from inside the barn is full.



Aucun commentaire :
Enregistrer un commentaire