The race is on to finish the down stairs of the weaving barn for Susie's 60th birthday part on Feb 21. The plasterboarding is almost finished as are the elctrics and plumbing. The WC arrives next week and Ian Smith is going to skim the ceilings and walls in the front room in a couple of weeks - the rest of the walls I ll tape and joint, with thestone walls being chaux chanvred (lime and hemp rendered) by me once the plastering is finished.
samedi 17 janvier 2026
Ground floor progress and a first trip out on the skis
The back room which we'll use for washing the fleeces still needs to be tiled
WC and hot water tank
Also managed to get out on the skis for the first time in 12 months since fracturing my Meniscus. I skinned up 400m from Com de la Trappe and did half a dzen runs before skiing back down to the car. Conditions were hard and icy, but the knee didn't complain.