First time in the mountains since my knee problems, but equipped with a pair of knee supports all went amazingly well. We (Al, Breezy, Sheri, Susie and I) started in the clouds from the new lower parking on the piste de mont noir above the Etang Bethmale. From there steeply up through the forest and clouds to the Col d'Auerole where our loop began.
mercredi 23 juillet 2025
Col de crouzette via etang d'eychelle et etang d'ayes
vendredi 18 juillet 2025
jeudi 17 juillet 2025
Stairs at last
A busy few days making a stair. Lots of routing to make the string housings, treads and risers, then a over hundred wedges. Assembly went fairly smoothly but the installation was a pig. Although it's only made from pine and only 73cm wide its still pretty heavy. The hole in the floor is a few cm wider than the stair, but the odd protruding rock, the newel post and other irritations made it impossible to get into place from below. After getting it wedged in the wrong place a rethink was necessary.
We got it free then dragged the whole stir up onto the first floor, then tried to install from above. Eventually after getting it stuck a second time, I reach for the hammer and bolster. Some stones were trimmed and numerous blows with "the persuader" aka a big mallet and the stair finally dropped into place.
Too coats of varnish before bed and we finally have easy access to the first floor.
mardi 1 juillet 2025
The elusive Golden Oriol
A few days ago the distinctive calls of a handful of Golden Oriols close to the house. I spent 2 hours trying to spot them in the canopy, let alone photograph them, without success. They're known to be secretive!
samedi 28 juin 2025
Hay
Crazy hot weather continues So decided to make the hay before storms arrive on Tuesday. The last few years the hay from the field in front of the house has been getting poorer. The grass is very fine and not at all leafy. So this year I decided to cut the pla d'artigue, which 5 or 6 years after clearing is now free of bracken. Cutting, tedding and putting into rows went without a hitch except for the shear quantity of grass this year. Bailing is always a problem. After the first 50m of attempting to get a bail the knotters suddenly started working....often the case. Then suddenly a loud bang! One of the recently replaced tyres had perished over the winter and the inner tube exploded. The rest of the bailing had to be accomplished with a flat tyre, the last 100m without a tyre at all as it came off! Half way through the drive shaft also disconnected from the gearbox. A beer and a few blows with a lump hammer and all was well again. The bailer twine also snagged on a bolt head, so about 50 bails need retying on one side. Haven't counted yet but probably over 200 bails off about half an acre.....it's been crazy growth with the wet spring. That's plenty of hay for the sheep, the other fields will all have to be cut in the late summer and left to compost. Tomorrow the task of repairing damaged bails and getting it all n the barn.
samedi 21 juin 2025
New warp
With the completion of the warping wheel a new sectional warp has been put on the loom. The warping wheel is a big improvement over a tension box and bobbins for my kind of weaving with many colour changes in the warp.
This weave will be a long cushion for our iron bedstead, a scarf and some smaller items (maybe another cushion). It's an advancing twill which will produce 'fractal" type patterns.
A regime of cycling twice a day seems to be helping my knee recovery, albeit slowly.
vendredi 6 juin 2025
Finally the void behind the wall I constructed from all the stones removed from inside the barn is full.
mercredi 4 juin 2025
Windows!
Most of the windows have finally arrived and been installed and despite some incredibly intense rain, excavation of our neighbour's and land and some communal land beside the barn and our land behind, has started.
jeudi 29 mai 2025
sheep shearing
dimanche 25 mai 2025
A busy week
mardi 6 mai 2025
Solar panels
Solar panels, battery etc installed over the last couple of days. All didn't go quite according to plan as the installer advised me that I only needed three cables between the house and the barn, when in fact I need 6. More digging in the next few weeks to connect power to the barn (at the installer's expense), but at least the house is supplied and so far, despite mediocre weather, we have fully charged our batteries, met all our needs and made our first cash putting surplus power into the grid.
samedi 3 mai 2025
lundi 28 avril 2025
Bedroom refurb continues
Still to do - the upper gable wall in lime and hemp, skirting boards and the mezzanine ceiling.
samedi 19 avril 2025
Wardrobes part 2
After moving our built in wardrobes about a year ago and recycling the framing to make new ones, nothing much happened because of works on the barn. Finally I found some doors which were more or less the right width. Unfortunately they were about 450mm/18 inches too high. I cut them down to size, removed the bottom rail and panel, cut the panel a bit shorter still, routed its bottom edge to match the thickness of the other three edges, then remounted and glued the bottom rail....so now they fit! Still have to frame the cubby holes on the right but I'll have to wait until the DIY place has restocked with the planed pine I used.
There's a couple of weeks until windows, doors and solar panels are fitted, so we might finally finish our bedroom refurbishment. Painting and reflooring planned.
mardi 8 avril 2025
vendredi 4 avril 2025
Digging
A busy week with an excavator (mini-pelle) connecting the barn to the septic tank and water supply and also installing electric and internet cables for the new solar panels will need to be connected to the meter in the house.