...on the outside at any rate!
mercredi 30 novembre 2016
lundi 28 novembre 2016
mardi 22 novembre 2016
Progress
A trip to Ardichen on Monday to finally see Hilda and Christian's place (it's only taken 7 years!). They have a lovely set up overlooking Castillon en Couserans and it was good catch up. A lovely break too from all the on going works. On the way back we put the Mitsubishi through its control technique, so now we just need to sell the Jimny and then we can put it on french plates.
Despite the rain today the polytunnel is progressing.
samedi 19 novembre 2016
vendredi 18 novembre 2016
A trip to Guzet
After fixing the car's exhaust and finishing the poly tunnel foundations, we took a day off and headed up to Guzet to play in the snow.
mardi 15 novembre 2016
samedi 12 novembre 2016
After the rain
Lots of rain for the last 4 days which has hampered progress, but still managed to concrete some steps, remove the exhaust from the Mitsubishi which sheared off last week and needs to be replaced and do some electrics in the gite.
Today has been clear and so after a trip to St Girons to collect materials and go to the market, we went for a stroll to the Col de Saraille. Lovely views and autumn colours.
mardi 8 novembre 2016
First snows of the year.
As forecast, snow showers on the mountains over the weekend and snow flurries here last night and today. It was only this afternoon that I finally finished the slating. Work was interrupted by the delivery of the poly tunnel, though I don't think we'll be erecting it for a week or more yet.
jeudi 3 novembre 2016
dimanche 30 octobre 2016
Pic Rouge de Bassies
Susie's Niece Emily and her boyfriend Edder have been here for 4-5 days, and after helping us with the land and digging new steps to the front door, we all went for a walk Up Pic Rouges de Bassies (2676m). Beautiful clear weather and fantastic views in all directions.
Mont Valier
Pic Rouge de Bassies on the horizon
Meanders and the refuge de Bassies
Summit
Lovely colours at the Etang de Lhers
8 hours with a mini digger and I have made a platform for the poly tunnel which arrives next week, widened the entry to the field in the front of the house, dug a drain for water which collects in front of the gite and eased the access between the Chemin de Quélebu and the Chemin de Pinsou.
A haze of smoke today originating from the forest fires in Northern Spain
mardi 25 octobre 2016
Slated
After 4 days graft the longer side of the gite roof is slated, but I don't have enough to do the second side so I'll have to buy some more slates!
Some rain yesterday evening but the today was balmy and warm.
samedi 22 octobre 2016
Roofing
Last week Susie's sister Jen was here and they busied themselves with step building beside the vegetable garden, whilst Jasper and I gathered firewood and laid some more hedges.
A lovely get together at chez Sheri's with John, Sandrine, Kim, Tim and Judith (who's organic garden we must vidit when she returns from Portugal).
Today Susie and I made a start on slating the gite roof, I continued all afternoon while she planted garlic and onions.
vendredi 14 octobre 2016
Autumn cometh
Rain all day today - snow above about 2200m. A quick wander in during a break in the weather gave some cep and orange birch bolettes.
jeudi 13 octobre 2016
mercredi 12 octobre 2016
Chickens
All go this week...chickens have arrived, the field clearances are being completed, a secondhand mulcher/shredder finally arrived from the UK and extra shelves and vegetable racks are under construction in the kitchen. More photos tomorrow.
samedi 1 octobre 2016
Muck
Some cooler weather this weekend after glorious weather all last week, but sunshine returns on Monday.
The garage is now concreted up to the road and on Friday we shifted 6 trailer loads of manure from Galas d'en Haut to the potager. Although only across the valley, it's a 25 minute trip each way. We tried the short cut via Le Sarrach, Moulin d'Aleu and Galassus - which was a bit of an adventure as the track along the river to the Moulin was deep mud...we made it through the but the car was plastered and we decided not to risk it in the uphill direction towing 600kg of manure in the trailer. A couple more loads tomorrow should do it.
mercredi 28 septembre 2016
Ham
Tucked into the boneless ham I made last winter, it's been air drying for about 9 months - delicious!
Susie been hard at work on the vegetable garden, I've been finishing the chicken run (salvaging old chicken wire and repairing holes) whilst Jasper's started on digging for the last bit of garage concrete slab.
The cats are now happily out and about and using the cat flap and the weather is fabulous.
Inscription à :
Commentaires
(
Atom
)
