jeudi 19 mai 2011

New septic tank!

The septic tank and filter are under the little green manhole

Another busy day. First of all building some support for the "dodgy" wall. Then pressing on with the oak frame for the double kitchen/diner window when a prolonged thunderstorm arrived in the afternoon.

The septic tank works are complete and operational - an inspection tomorrow from SPANC the specialist department of the water board (SMDEA) which looks after septic tank installations.

There is still a lot of stone walling to build including a retaining wall and I'm reconsidering if I need the little window beside the big double one.
View from the kitchen
View up the road

Aucun commentaire :