jeudi 3 avril 2014

Bathroom works

The hot wind continued to blow yesterday, so I continued with bringing down more hung up trees (the not so threatening ones), though they were still challenging trees to bring down safely. Ian arrived in the late afternoon with some oak for the bathroom and I headed over to his to help unload his wood and stay for supper.

Overnight some wet weather has arrived, so today I cracked on with plasterboarding the bathroom and plastering the joints. I managed to get the first first of the oak in place (the window board) but the continuing rain called a halt to proceeding before I could do the window and door reveals (I have to cut and plane the timber outside).



Sandrine and John over for Dinner tonight.



Aucun commentaire :