lundi 9 mars 2015

Pont works

Long days at La Falaise repairing the damage from my lovely tenants. Repaired the shower and hot water system, re-glazed the skylights, mended the bathroom extract, re-hung the radiator in the kitchen, I've installed a window in the front door which makes the entrance much lighter.


The balcony guarding, which the tenants all but destroyed, is now repaired.


Kitchen floor re-varnished.


Living room repainted, floor re-varnished and broken lamps in the dining room replaced.


Much work outside also, burning rubbish and strimming.


By the time I get home this is all I see!!

Aucun commentaire :