In between architecture work, some time to give the pond a makeover, levelling the banks and raising the banks by 25cm or so with some sandbags filled with drymix. New gates for some of the fields too.
jeudi 17 octobre 2019
Inscription à :
Publier les commentaires
(
Atom
)
Aucun commentaire :
Enregistrer un commentaire