Two six hour concreting shifts and about 3/5 of the barn floor is laid. Another cubic metre tomorrow then I need more cement and ballast for the last section.
Sheep shearing is tomorrow and as normal 4 sheep sheep refused to go in the barn. Two and a half hours of chasing them and finally they're in. minutes before the drizzle started, so we should be good to go tomorrow.
Managed to get a brand new scaffold tower on "leboncoin" and saved myself 300 euros. The seller was a bit dodgy, but as long as I paid cash all was good. The scaffolding is still in its original plastic unopened wrapping. The plans for the barn construction stages are slowly taking shape, hopefully we'll be watertight and re-roofed before the end of the year.