samedi 18 août 2007

Pas d'oiseau


After a few steps back with the 'pas d'oiseau', at last some steps forward. Things are beginning to shape up and details are being solved. The slabs now follow the pitch line of the roof 300mm above the level of the battens.
Several slabs and their supporting blocks had to be replaced. Moving 30kg blocks of granite or a huge flagstones high on the roof was both difficult, exhausting and dangerous - calling for extreme care and concentration! There aren't too many to replace thankfully, I've started on the gable in worst condition.

Aucun commentaire :