Barn progress

A very long day working on the barn. Lintels finally up on the first window and internal reveals done.


Then it was onto the second window which needed the old frame taken out, the cill lowered and width slightly reduced. The old frame was built in and offered support to the walls on either side (dry stone construction, no mortar) so when it came out there was rather a lot of wall to rebuild. All done by 7.30pm.