Was going to go into the mountains today but overslept...doh! Weather was very hot and sunny so busied myself with sorting out all the foundation levels (built a set of legs for the ranging pole which now stands up by itself). After quite a bit of trigonometry and measuring, I marked out all the column base locations on the foundations. The hammer drill needed collecting from Pont de la Taule, then I bolted all the column bases to the foundations.
Moved the sheep back into field 3, before Dédé, Minsou and Louise came over for a chat and some eggs. "Toad in the hole" for tea.
Tomorrow will probably give Justin and Emily a hand again.
dimanche 21 septembre 2008
Inscription à :
Publier les commentaires
(
Atom
)
Aucun commentaire :
Enregistrer un commentaire