Difficult to see what's going on in these photo's but basically I've broken through the wall at Pont de la Taule and have started installing a door frame. Work is difficult as the marble blocks are enormous and as none of the walling is coursed it's very difficult to match opening heights on either side of the wall. Everything is held up with acro-props and I was glad to reach a stage at which having rebuilt part of the wall above one of the lintols, I had an excuse to clean up and leave!
Back at Quélébu by 3.00pm, I converted my little first floor fixed window which I installed earlier in the year, into an opening window.
Aucun commentaire :
Enregistrer un commentaire